Wexpro/Questar Gas - 2006 – GLS Primary contractor with 2 survey crews - This project consisted of locating well sites, preparing plats, topographic maps and design roads from public roads to the well sites. These well sites were located in the geographical areas of Rock Springs, Wyoming, Vernal, Utah and Rifle, Colorado. We also mapped existing gas gathering systems.

 


 

 

 

Williams/Northwest pipeline – 2006 Fort Lewis Loop project in Spanaway, WA approximately 20 miles ending southwest of Rainer, WA – Global Land Services, Inc., worked as a sub-contractor providing 2 survey crews to Cook & Sanders & Associates – This project consisted of locating  two existing 26” pipelines and a 30” pipeline paralleling the new 36” pipeline installation with pipe locators. We staked the pipeline right of way, ditch line, environmental areas, work space and extra work space. We also pipe tallied the 36” pipeline heat, serial and pipe numbers on each pipe. We also surveyed tie-ins and road bores. 

 

 

 

 

 

 

Pacific Connector Gas Pipeline – 2006 Global Land Services, Inc. Worked as a sub contractor providing 38 survey personnel to Cook & Sanders for a proposed pipeline from Coos Bay, Oregon to Malin, California. Global was responsible for collecting pertinent topographic route feature data and staking a proposed centerline route for 137 miles through very rough terrain and thick vegetation while maintaining a very aggressive schedule for FERC filing.



File written by Adobe Photoshop® 5.2Enterprise Products – 2007 Global Land Services, Inc. Worked as a primary contractor for setting above ground markers, mapping markers, creating to reach descriptions for tracking tools and staking dig sites for 14” Seminole Rehab project from Forsan, TX TO Millersview, TX for approximately
121 miles.

 

Enterprise Products – 2007 Global Land Services, Inc. Worked as a primary contractor for setting above ground markers, mapped markers, create to reach descriptions for tool trackers and staked dig sites for Teppco 12” pipeline from Midland, TX to Snyder, TX for approximately 88 miles

 

Enterprise Products – 2007 Global Land Services, Inc. Worked as a primary contractor for setting above ground markers, mapped markers, create to reach descriptions for tool trackers and staked dig sites for Teppco 12” pipeline from Junction, TX to Midkiff, TX for approximately 200 miles.

 

TD Williamson Pipeline Services, Inc. – 2007 Global Land Services, Inc. Worked as a primary contractor providing tool trackers, tool launchers and receivers for an 8” Rocky Mountain Pipeline from Medicine Bow Wyoming to Wamsutter, Wyoming approximately 100 Miles.

 

 TD Williamson Pipeline Services, Inc. – 2007 Global Land Services, Inc. Worked as a primary contractor providing tool trackers, tool launchers and receivers for an 12” Pipeline from Langsdale, Mississippi to Tuscaloosa, Alabama approximately 130 Miles.

 

TD Williamson Pipeline Services, Inc. – 2007 Global Land Services, Inc. Worked as a primary contractor providing tool trackers, tool launchers and receivers for an 18” Longhorn Pipeline from Crane, Texas to El Paso, Texas approximately 290 Miles.

 

Overland Pass Pipeline Co. - 2007 Global Land Services, Inc., worked as a sub-contractor providing 4 survey crews to Golden Field Services to build a 750-mile natural gas pipeline from Opal, Wyo., in the southwestern part of the state, to the mid- continent natural gas liquids market center in Conway, Kan., This project consisted of staking the pipeline right of way, ditch line, environmental areas, work space and extra work space. All surveying data was gathered using data collectors, laptops, Internet access and the latest in GPS /Surveying equipment.

 

El Paso -2008 Global Land Services, Inc., worked as a sub-contractor providing 4 survey crews to Shafer Klien and Warren. This project consisted of Depth of cover survey, locating above ground markers, setting above ground markers, collecting topographic data and probing existing pipelines from California through Arizona.  All surveying data was gathered using data collectors, laptops, Internet access and the latest in GPS /Surveying equipment.

 


Enbridge Stage 1 Access – 2007 /2008 Global Land Services, Inc., worked as a sub-contractor providing 4 survey crews. Stage 1 construction on 321 miles of new 42” pipeline in Wisconsin. This project consisted of tracking pipe materials, recording them and cross-referencing all pipe installation information. The winter construction required as built of all referenced pipe materials. We staked the pipeline right of way, ditch line, environmental areas, work space and extra work space. We also pipe tallied the 42” pipeline heat, serial and pipe numbers on each pipe. We also surveyed tie-ins and road bores.   All surveying data was gathered using data collectors, laptops, Internet access and the latest in GPS /Surveying equipment.


 

Enbridge Southern Access Stage 2 – 2007 /Present Global Land Services, Inc., is currently working as a primary contractor providing project management, 12 survey crews, 6 survey technicians. The project consists of the construction of approximately 133 miles of new 42” and 20” paralleling pipelines from Enbridge's Delavan pumping station near Whitewater, Wis., to its Flanagan terminal near Pontiac, Ill., where it will connect with Enbridge's Spearhead System west of Chicago.  Most construction will be in 2008, and operation will begin in spring 2009. This project requires tracking pipe materials, recording them and cross-referencing all pipe installation information. The construction requires as build of all referenced pipe materials. We stake the pipeline right of way, ditch line, environmental areas, work space and extra work space. We also pipe tally the 42” and 20” pipeline heat, serial and pipe numbers on each pipe. We also survey tie-ins, road bores and water crossings.   All surveying data is gathered using data collectors, laptops, Internet access and the latest in GPS /Surveying equipment.